Small Nuclear Reactors (SMR) for Data Center Market Overview
2025 market size, 2026 estimate, 2034 forecast and commercial demand.
Executive Market Perspective
The global Small Nuclear Reactors (SMR) for Data Center Market was valued at USD 0.97 billion in 2025 and is estimated at USD 1.13 billion in 2026, rising to USD 3.99 billion by 2034 at a 17.0% compound annual growth rate during 2026–2034. North America represents the largest regional demand pool in the base year. The defined market measures revenue from advanced modular reactor technology, project engineering and integrated nuclear power development linked specifically to contracted or proposed critical-computing electricity demand. It excludes unrelated computing hardware, grid electricity consumption, and broader mechanical or electrical systems not sold as in-scope market products or services. Commercial expansion depends on technical qualification and coordinated capital decisions rather than headline AI investment alone.
Small Nuclear Reactors (SMR) for Data Center Market purchasing is being reshaped by providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. The NRC approved NuScale US460 as a standard design in May 2025, but that approval does not itself constitute a permit to build or operate a data-center reactor. Kairos Hermes 2 has separate test-reactor construction permissions. Direct supplier contracts increasingly integrate equipment performance, commissioning acceptance and maintainability, requiring technical review by infrastructure and operations teams before procurement. This creates value for suppliers able to provide documented compatibility and traceable product specifications rather than a catalog-based proposition alone.
Demand formation reflects the expanding installed base of accelerated-computing infrastructure and its need for dependable small modular reactors proposed for powering data center facilities. The International Energy Agency projects global data-center electricity consumption near 945 TWh by 2030, versus 2024 levels near 415 TWh. That is context for the scale of physical computing infrastructure, not a direct proxy for component or microgrid sales. The relevant purchasing mechanism is providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. As site designs become denser and more modular, purchasing authorities require documented pressure, electrical or interoperability limits as appropriate to the selected equipment.
Competitive procurement turns on lifecycle performance rather than initial price alone. Suppliers serving data-center developers, utilities, nuclear project sponsors and long-term power offtakers must demonstrate factory quality, consistent field installation and component-level traceability. Product-design details include reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering. These requirements influence preferred-vendor lists, tender qualification, availability of spare parts and field-service arrangements. As developers add capacity across multiple campuses, standardized assemblies can lower commissioning complexity, although actual deployment still depends on construction sequencing and local operating constraints. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
The regional opportunity is uneven because North American hyperscale construction and AI deployment differ from established European retrofit conditions and Asian supply-chain concentration. Country exposure must be read alongside site-level engineering, not inferred from national data-center power demand alone. In the United States, constrained utility access can affect project phasing; Europe emphasizes resource management and compliance; Asia-Pacific combines component production with accelerating compute installations. Those differences change equipment specifications, service expectations and contract timing within small modular reactors proposed for powering data center facilities. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Forecast conversion depends on qualified supply and credible onsite implementation. The NRC approved NuScale US460 as a standard design in May 2025, but that approval does not itself constitute a permit to build or operate a data-center reactor. Kairos Hermes 2 has separate test-reactor construction permissions. The operational test is whether customers can install, maintain and expand systems without degrading service continuity. For buyers, design freeze, factory acceptance, safety documentation and completed connection interfaces precede recurring orders. For vendors, warranties and validated field configurations influence margin quality and service revenue. The forecast therefore describes a commercial opportunity shaped by execution, not simply an extrapolation of server growth.
Key Takeaways: Small Nuclear Reactors (SMR) for Data Center Market
- Global Small Nuclear Reactors (SMR) for Data Center Market revenue reached USD 0.97 billion in 2025.
- The market is forecast at USD 3.99 billion by 2034, a 17.0% CAGR from the USD 1.13 billion 2026 estimate.
- Light-Water SMR Designs led By Type with an estimated 42% of 2025 market revenue.
- Hyperscale AI Data Center Supply led By Application with an estimated 42% of 2025 market revenue.
- North America held an estimated 57% of 2025 revenue and remained the largest regional demand pool.
- Growth drivers include providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts, higher AI compute density, system interoperability and site-level commissioning requirements.
- Companies active in relevant product and system supply include NuScale Power, X-energy, Kairos Power, GE Hitachi Nuclear Energy, Rolls-Royce SMR, TerraPower, Holtec International, Westinghouse Electric Company, BWX Technologies; participation differs by product scope.
- The 2026–2034 market analysis covers Type, Application, Project Stage, Delivery Structure, regional opportunity, procurement and lifecycle reliability.
Coverage
Report Scope & Market Segmentation
Four non-overlapping market views with geography and verified company participation.
| Report Attribute | Coverage |
| Base Year | 2025 |
| Estimated Year | 2026 |
| Forecast Period | 2026–2034 |
| Market Measurement | Revenue, USD billion |
| By Type | Light-Water SMR Designs; High-Temperature Gas Reactors; Molten-Salt and Fluoride-Cooled Systems; Fast Reactor and Microreactor Designs |
| By Application | Hyperscale AI Data Center Supply; Colocation Campus Power; Utility-Backed Data Center Power; Offsite Dedicated Nuclear PPAs |
| By Project Stage | Concept and Offtake Agreement; Design and Site Licensing; Construction and Commissioning; Operating Supply Arrangements |
| By Delivery Structure | Grid-Connected Utility Supply; Direct-Wire and Dedicated Campus Supply; Long-Term Offsite PPA |
| By Region | North America; Europe; Asia-Pacific; Latin America; Middle East & Africa |
| Selected Countries | United States; Canada; Germany; United Kingdom; France; China; Japan; South Korea; India; Singapore; Brazil; Mexico; United Arab Emirates; Saudi Arabia |
| Key Market Players | NuScale Power; X-energy; Kairos Power; GE Hitachi Nuclear Energy; Rolls-Royce SMR; TerraPower; Holtec International; Westinghouse Electric Company; BWX Technologies; Oklo |
Geography
Small Nuclear Reactors (SMR) for Data Center Market Regional Analysis
Five global regions, market-specific countries and differentiated purchasing conditions.
North America represented an estimated 57% of global small modular reactors proposed for powering data center facilities revenue in 2025. Europe, Asia-Pacific, Latin America and the Middle East & Africa account for the remainder of the geographic revenue model, with all regional shares summing to 100%. These distributions describe sales of the defined market products and services, not data-center electricity use or national GDP. Country-level opportunities reflect deployment stage, infrastructure interfaces, component sourcing and the extent to which customer specifications require local support. The same purchasing logic is applied consistently across all regional comparisons. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
North America
Estimated 2025 share: 57%North America accounted for an estimated 57% of 2025 global demand for small modular reactors proposed for powering data center facilities. The United States is the anchor demand market because cloud infrastructure clusters require repeatable qualification of small modular reactors proposed for powering data center facilities across many facility phases. Canada contributes colocation and cloud investment, although interconnection and energy planning differ by province. Demand concentrates where equipment compatibility, operational support and safety review can be demonstrated before multi-building deployment. The strongest opportunities follow projects where providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts has been translated into an approved build specification and a funded procurement package.
United StatesUnited States matters to small modular reactors proposed for powering data center facilities because deployment and sourcing decisions require a credible local installation pathway. Buyers assess reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering, then verify compatibility with site-specific interfaces and service response. Procurement potential depends on actual funded computing facilities rather than national electricity or digital-market totals. Equipment makers that support qualified integrations and maintenance requirements are better placed to convert pipeline interest into deliveries. U.S. buyers frequently insist on nationally recognized component approvals, traceable failure analysis and clear responsibility for installation. Procurement is generally campus-specific, with service coverage and spares availability weighed alongside electrical performance.
CanadaCanada matters to small modular reactors proposed for powering data center facilities because deployment and sourcing decisions require a credible local installation pathway. Buyers assess reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering, then verify compatibility with site-specific interfaces and service response. Procurement potential depends on actual funded computing facilities rather than national electricity or digital-market totals. Equipment makers that support qualified integrations and maintenance requirements are better placed to convert pipeline interest into deliveries. Canadian operators must consider provincial power availability, facility electrical approvals and winter environmental operating conditions. Procurement is sensitive to distribution-network readiness and to whether the manufacturer has qualified service resources near the installation.
Europe
Estimated 2025 share: 20%Europe accounted for an estimated 20% of 2025 global demand for small modular reactors proposed for powering data center facilities. Germany, the United Kingdom and France combine established enterprise computing, colocation demand and modernization activity. Energy efficiency, operational documentation and infrastructure-reuse decisions can create procurement cycles distinct from greenfield AI campuses. Supplier choice depends on engineering evidence, service reach and conformance with site requirements rather than market-wide electricity growth alone. The strongest opportunities follow projects where providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts has been translated into an approved build specification and a funded procurement package.
GermanyGermany matters to small modular reactors proposed for powering data center facilities because deployment and sourcing decisions require a credible local installation pathway. Buyers assess reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering, then verify compatibility with site-specific interfaces and service response. Procurement potential depends on actual funded computing facilities rather than national electricity or digital-market totals. Equipment makers that support qualified integrations and maintenance requirements are better placed to convert pipeline interest into deliveries. German data-center deployments require strong energy efficiency documentation, conformance with electrical installation rules and dependable field support. Decisions can favor modular replacement and service pathways that avoid lengthy planned interruptions during equipment refresh.
United KingdomUnited Kingdom matters to small modular reactors proposed for powering data center facilities because deployment and sourcing decisions require a credible local installation pathway. Buyers assess reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering, then verify compatibility with site-specific interfaces and service response. Procurement potential depends on actual funded computing facilities rather than national electricity or digital-market totals. Equipment makers that support qualified integrations and maintenance requirements are better placed to convert pipeline interest into deliveries. British colocation operators face network access and property constraints in established hubs. Product selection prioritizes compatibility with older halls, commissioning documentation, delivery schedules and long-term availability of certified replacement hardware.
FranceFrance matters to small modular reactors proposed for powering data center facilities because deployment and sourcing decisions require a credible local installation pathway. Buyers assess reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering, then verify compatibility with site-specific interfaces and service response. Procurement potential depends on actual funded computing facilities rather than national electricity or digital-market totals. Equipment makers that support qualified integrations and maintenance requirements are better placed to convert pipeline interest into deliveries. French demand is shaped by enterprise cloud infrastructure, new computing campuses and technical requirements from electrical safety authorities. Supplier qualification must account for conformity, spare parts, and coordination between equipment OEMs and commissioning contractors.
Asia-Pacific
Estimated 2025 share: 19%Asia-Pacific accounted for an estimated 19% of 2025 global demand for small modular reactors proposed for powering data center facilities. China, Japan, South Korea, India and Singapore bring varied manufacturing and adoption conditions. East Asian suppliers contribute important engineering and electronics ecosystems, while India and Southeast Asia add capacity driven by cloud localization and digital-services demand. Local standards, import exposure and installation capabilities determine where in-scope equipment revenue is recognized. The strongest opportunities follow projects where providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts has been translated into an approved build specification and a funded procurement package.
ChinaChina matters to small modular reactors proposed for powering data center facilities because deployment and sourcing decisions require a credible local installation pathway. Buyers assess reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering, then verify compatibility with site-specific interfaces and service response. Procurement potential depends on actual funded computing facilities rather than national electricity or digital-market totals. Equipment makers that support qualified integrations and maintenance requirements are better placed to convert pipeline interest into deliveries. Chinese demand combines major server and electrical manufacturing clusters with domestic AI infrastructure builds. Vendors compete on localization, high-volume repeatability, performance testing and the ability to respond to customer-specific engineering changes.
JapanJapan matters to small modular reactors proposed for powering data center facilities because deployment and sourcing decisions require a credible local installation pathway. Buyers assess reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering, then verify compatibility with site-specific interfaces and service response. Procurement potential depends on actual funded computing facilities rather than national electricity or digital-market totals. Equipment makers that support qualified integrations and maintenance requirements are better placed to convert pipeline interest into deliveries. Japan places considerable emphasis on reliability, earthquake-related facility planning and dependable maintenance coverage. Equipment selection can involve more stringent supplier documentation and replacement logistics than the nominal electrical rating alone indicates.
South KoreaSouth Korea matters to small modular reactors proposed for powering data center facilities because deployment and sourcing decisions require a credible local installation pathway. Buyers assess reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering, then verify compatibility with site-specific interfaces and service response. Procurement potential depends on actual funded computing facilities rather than national electricity or digital-market totals. Equipment makers that support qualified integrations and maintenance requirements are better placed to convert pipeline interest into deliveries. South Korean cloud and semiconductor-linked computing clusters impose demanding power density and installation criteria. OEM relationships, electronics supply depth and local service readiness influence which suppliers can translate design wins into repeat purchasing.
Latin America
Estimated 2025 share: 2%Latin America accounted for an estimated 2% of 2025 global demand for small modular reactors proposed for powering data center facilities. Brazil and Mexico are useful country lenses because cloud infrastructure expands alongside constraints involving energy access, import logistics and specialist maintenance. Equipment deployment generally follows funded data-center development rather than automatically mirroring regional electricity consumption. Import support, local field service and operating reliability affect project specifications and supplier selection. The strongest opportunities follow projects where providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts has been translated into an approved build specification and a funded procurement package.
BrazilBrazil matters to small modular reactors proposed for powering data center facilities because deployment and sourcing decisions require a credible local installation pathway. Buyers assess reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering, then verify compatibility with site-specific interfaces and service response. Procurement potential depends on actual funded computing facilities rather than national electricity or digital-market totals. Equipment makers that support qualified integrations and maintenance requirements are better placed to convert pipeline interest into deliveries. Brazilian procurement depends on utility access, import duties, facility engineering approvals and local warranty delivery. Projects in major metro areas often require technically qualified integration partners and predictable spare-part replenishment.
MexicoMexico matters to small modular reactors proposed for powering data center facilities because deployment and sourcing decisions require a credible local installation pathway. Buyers assess reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering, then verify compatibility with site-specific interfaces and service response. Procurement potential depends on actual funded computing facilities rather than national electricity or digital-market totals. Equipment makers that support qualified integrations and maintenance requirements are better placed to convert pipeline interest into deliveries. Mexican facilities benefit from regional digital-infrastructure investment but face country-specific grid and import logistics. Orders depend on credible electrical design packages, testing arrangements and the ability to coordinate with cross-border hardware supply chains.
Middle East & Africa
Estimated 2025 share: 2%Middle East & Africa accounted for an estimated 2% of 2025 global demand for small modular reactors proposed for powering data center facilities. The United Arab Emirates and Saudi Arabia are relevant infrastructure investment markets, with specification decisions sensitive to climate, energy strategy and large project schedules. Procurement frequently involves international engineering providers and local installation partners. Operational resilience and maintainability drive selection, while future order conversion depends on completed campuses and approved connection designs. The strongest opportunities follow projects where providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts has been translated into an approved build specification and a funded procurement package.
United Arab EmiratesUnited Arab Emirates matters to small modular reactors proposed for powering data center facilities because deployment and sourcing decisions require a credible local installation pathway. Buyers assess reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering, then verify compatibility with site-specific interfaces and service response. Procurement potential depends on actual funded computing facilities rather than national electricity or digital-market totals. Equipment makers that support qualified integrations and maintenance requirements are better placed to convert pipeline interest into deliveries. UAE data-center facilities must address high ambient-temperature operating conditions, reliable cooling infrastructure and multinational contractor coordination. Technical acceptance and service infrastructure remain important for recurring equipment purchasing.
Saudi ArabiaSaudi Arabia matters to small modular reactors proposed for powering data center facilities because deployment and sourcing decisions require a credible local installation pathway. Buyers assess reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering, then verify compatibility with site-specific interfaces and service response. Procurement potential depends on actual funded computing facilities rather than national electricity or digital-market totals. Equipment makers that support qualified integrations and maintenance requirements are better placed to convert pipeline interest into deliveries. Saudi projects are influenced by large campus development schedules, localization policy and utility infrastructure timing. Supply contracts need to align documented engineering acceptance with local delivery capability and long-term maintenance commitments.
Grid Integration
Small Nuclear Reactors (SMR) for Data Center Market Competitive Landscape
Investment, product architecture and commercial signals shaping the small nuclear reactors (smr) for data center market competitive landscape.
The supplier ecosystem is structured around reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering, product qualification and integration support. Participants include NuScale Power, X-energy, Kairos Power, GE Hitachi Nuclear Energy, Rolls-Royce SMR, TerraPower, Holtec International, Westinghouse Electric Company, BWX Technologies, Oklo. The list spans direct product vendors and relevant system integrators; it is not a revenue ranking, and participation in a wider data-center project does not imply a company produces every in-scope component. Competitive differentiation rests on precise product-fit, documented interfaces, installed-system compatibility and available field support. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
For buyers, supplier due diligence must establish the role of the company under the actual purchase order. Direct manufacturing may be distinct from assembling, integrating or servicing a facility package, while several suppliers participate through different parts of the value chain. Specifications focus on providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Vendor approval therefore tends to combine technical qualification, factory capacity, warranty commitments and experience with comparable systems. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Commercial leverage increases when equipment designs can be reused without forcing a single supplier across every connection point. Multiple qualified sources reduce schedule exposure, but multi-sourcing requires documented tolerances, accepted test procedures and clear responsibility for failures at interfaces. The NRC approved NuScale US460 as a standard design in May 2025, but that approval does not itself constitute a permit to build or operate a data-center reactor. Kairos Hermes 2 has separate test-reactor construction permissions. Product certifications are not a substitute for system-level integration testing where flow, electrical operation or controller coordination depends on the installed configuration. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Suppliers face a changing balance between factory scale and engineering customization. High-volume standard assemblies support purchasing consistency, but customer-specific designs often require additional mechanical, controls or system validation. The cost of late engineering changes can exceed the nominal cost difference between suppliers. Selection therefore gives weight to ability to deliver tested configurations, resolve site problems and maintain continuity as campuses add further capacity. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
NuScale Power
X-energy
Kairos Power
GE Hitachi Nuclear Energy
Rolls-Royce SMR
TerraPower
Holtec International
Westinghouse Electric Company
BWX Technologies
Oklo
Grid Integration
Market Growth Drivers, Restraints & Commercial Factors
Investment, product architecture and commercial signals shaping the market growth drivers, restraints & commercial factors.
Market demand depends on credible plans for small modular reactors proposed for powering data center facilities and the ability to translate building-level construction decisions into qualified purchase orders. Expansion of computing capacity is a favorable backdrop, but supplier revenue follows detailed designs, accepted products and commissioning schedules rather than a broad AI-capital-expenditure announcement. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance. The commercial consequence is visible in the relationship between reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering and installation schedules; a component that can be purchased independently still needs to match the larger system configuration and its documented operating conditions.
Growth driver: Providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts creates new technical requirements at each expansion phase. Standard interfaces can accelerate repeat deployments, provided the actual installed equipment meets operating limits and lifecycle expectations. Engineering teams increasingly evaluate performance as a system property, so suppliers must support testing and documentation beyond product brochures. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Demand visibility: Data-center developers, utilities, nuclear project sponsors and long-term power offtakers establish demand through approved architectures, supply contracts and phased commissioning. A capacity plan can change before procurement if a grid connection is deferred, a rack platform changes or a facility switches operating assumptions. Suppliers therefore benefit from understanding both the compute roadmap and the adjacent physical infrastructure schedule. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance. The commercial consequence is visible in the relationship between reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering and installation schedules; a component that can be purchased independently still needs to match the larger system configuration and its documented operating conditions.
Technology upside: The NRC approved NuScale US460 as a standard design in May 2025, but that approval does not itself constitute a permit to build or operate a data-center reactor. Kairos Hermes 2 has separate test-reactor construction permissions. Better monitoring, repeatable interconnection and standardized performance testing may reduce integration friction. The benefit is highest where retrofit constraints or serviceability demands make manual rework expensive. Product innovations must still demonstrate a material advantage at the installed-system level before premium pricing becomes sustainable. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Infrastructure constraint: High-voltage interconnection studies, grid-balancing requirements, nuclear site selection, contingency power procurement and regulated utility tariffs can delay equipment installation even when project funding exists. Contractors must coordinate procurement with design sign-off, mechanical or electrical readiness and safety reviews. Unresolved interfaces raise the cost of commissioning and can shift acceptance dates, complicating the revenue profile of component suppliers. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance. The commercial consequence is visible in the relationship between reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering and installation schedules; a component that can be purchased independently still needs to match the larger system configuration and its documented operating conditions.
Supply restraint: Reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering may involve specialized testing, capacity reservation and approved subcomponent sources. A nominally simple assembly can become a critical-path item if its compliance package, operating limits or dimensional interface is unresolved. Procurement teams increasingly look for traceability, standard service parts and an alternative qualified source. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Commercial factor: Site-specific nuclear licensing, cost escalation, supply-chain qualification, fuel availability, cooling-water access, spent-fuel plans and construction lead times change the economics of lifetime ownership. Buyers compare reliability, spares and recovery time alongside acquisition cost because interruption consequences are asymmetric. Contracts may therefore include commissioning milestones, replacement obligations and testing provisions. Well-defined system boundaries reduce disputes between the manufacturer, integrator and site operator. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Segmentation
Market Segmentation By Type
Four categories distinguish by type purchasing and deployment characteristics.
Light-Water SMR Designs accounted for an estimated 42% of 2025 revenue within By Type. The category shares across this dimension total 100%.
By Type separates customers and suppliers using distinct purchasing or technical decision criteria rather than additive slices of the entire market. Each category refers to the same 2025 market boundary, and the revenue model is complete within this dimension. The commercial significance is not only share: equipment choice affects providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Procurement timing also depends on interface approval, testing capability and installed-site requirements. A share describes a market mix, whereas a data-center investment plan does not establish a segment sale until contracted equipment is delivered. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Light-Water SMR Designs
Light-Water SMR Designs serves a distinct type configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 42%, within a complete mutually exclusive distribution for this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
High-Temperature Gas Reactors
High-Temperature Gas Reactors serves a distinct type configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 28%, within a complete mutually exclusive distribution for this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
Molten-Salt and Fluoride-Cooled Systems
Molten-Salt and Fluoride-Cooled Systems serves a distinct type configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 15%, within a complete mutually exclusive distribution for this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
Fast Reactor and Microreactor Designs
Fast Reactor and Microreactor Designs serves a distinct type configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 15%, within a complete mutually exclusive distribution for this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
Segmentation
Market Segmentation By Application
Four categories distinguish by application purchasing and deployment characteristics.
Hyperscale AI Data Center Supply accounted for an estimated 42% of 2025 revenue within By Application. The category shares across this dimension total 100%.
By Application separates customers and suppliers using distinct purchasing or technical decision criteria rather than additive slices of the entire market. Each category refers to the same 2025 market boundary, and the revenue model is complete within this dimension. The commercial significance is not only share: equipment choice affects providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Procurement timing also depends on interface approval, testing capability and installed-site requirements. A share describes a market mix, whereas a data-center investment plan does not establish a segment sale until contracted equipment is delivered. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Hyperscale AI Data Center Supply
Hyperscale AI Data Center Supply serves a distinct application configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 42%, within a complete mutually exclusive distribution for this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
Colocation Campus Power
Colocation Campus Power serves a distinct application configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 19%, within a complete mutually exclusive distribution for this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
Utility-Backed Data Center Power
Utility-Backed Data Center Power serves a distinct application configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 25%, within a complete mutually exclusive distribution for this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
Offsite Dedicated Nuclear PPAs
Offsite Dedicated Nuclear PPAs serves a distinct application configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 14%, within a complete mutually exclusive distribution for this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
Segmentation
Market Segmentation By Project Stage
Four categories distinguish by project stage purchasing and deployment characteristics.
Concept and Offtake Agreement accounted for an estimated 53% of 2025 revenue within By Project Stage. The category shares across this dimension total 100%.
By Project Stage separates customers and suppliers using distinct purchasing or technical decision criteria rather than additive slices of the entire market. Each category refers to the same 2025 market boundary, and the revenue model is complete within this dimension. The commercial significance is not only share: equipment choice affects providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Procurement timing also depends on interface approval, testing capability and installed-site requirements. A share describes a market mix, whereas a data-center investment plan does not establish a segment sale until contracted equipment is delivered. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Concept and Offtake Agreement
Concept and Offtake Agreement serves a distinct project stage configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 53%, within a complete mutually exclusive distribution for this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
Design and Site Licensing
Design and Site Licensing serves a distinct project stage configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 27%, within a complete mutually exclusive distribution for this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
Construction and Commissioning
Construction and Commissioning serves a distinct project stage configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 17%, within a complete mutually exclusive distributionfor this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
Operating Supply Arrangements
Operating Supply Arrangements serves a distinct project stage configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 3%, within a complete mutually exclusive distribution for this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
Segmentation
Market Segmentation By Delivery Structure
Four categories distinguish by delivery structure purchasing and deployment characteristics.
Grid-Connected Utility Supply accounted for an estimated 47% of 2025 revenue within By Delivery Structure. The category shares across this dimension total 100%.
By Delivery Structure separates customers and suppliers using distinct purchasing or technical decision criteria rather than additive slices of the entire market. Each category refers to the same 2025 market boundary, and the revenue model is complete within this dimension. The commercial significance is not only share: equipment choice affects providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Procurement timing also depends on interface approval, testing capability and installed-site requirements. A share describes a market mix, whereas a data-center investment plan does not establish a segment sale until contracted equipment is delivered. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Grid-Connected Utility Supply
Grid-Connected Utility Supply serves a distinct delivery structure configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 47%, within a complete mutually exclusive distribution for this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
Direct-Wire and Dedicated Campus Supply
Direct-Wire and Dedicated Campus Supply serves a distinct delivery structure configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 21%, within a complete mutually exclusive distribution for this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
Long-Term Offsite PPA
Long-Term Offsite PPA serves a distinct delivery structure configuration within the small modular reactors proposed for powering data center facilities market. Its estimated 2025 category share was 32%, within a complete mutually exclusive distribution for this segmentation view. Purchasing decisions require vendors to show how the design supports providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Deployment differences involve operating limits, integration steps and the availability of qualified service parts. Equipment is most attractive where the chosen configuration fits existing facility procedures and reduces modification of the adjacent system. Buyers weigh compatibility and acceptance testing as well as quoted hardware price.
Grid Integration
Supply Chain, Manufacturing Capacity & Procurement
Investment, product architecture and commercial signals shaping the supply chain, manufacturing capacity & procurement.
The supply chain for small modular reactors proposed for powering data center facilities combines reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering. Those elements may be sourced from different vendors even when the final order is placed through a single integrator. Quality assurance depends on matching material specifications, documented manufacturing processes and final acceptance procedures to the site application. An unqualified substitution can force reinspection or redesign, so vendor selection must consider subcomponent control and production traceability. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Procurement exposure is concentrated around design freeze, factory testing and logistics for field-ready equipment. Data-center developers, utilities, nuclear project sponsors and long-term power offtakers often need deliveries synchronized with rack commissioning or plant readiness rather than simply produced at minimum cost. Large deployment programs benefit from repeatable bills of materials, but customization remains necessary when footprints, access, fluid chemistry or local electrical rules differ. Inventory strategy therefore balances common replacement parts with made-to-order elements. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Manufacturing scalability alone does not guarantee market share: vendors need engineering support capable of resolving changes as installation details mature. The strongest operating programs define ownership for testing, site acceptance, spares and warranty response. Supply agreements benefit from limits on component substitutions and from traceable revision histories. This reduces the likelihood that an apparently small interface deviation turns into a site-wide commissioning problem. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Grid Integration
Infrastructure Connection & Investment Outlook
Investment, product architecture and commercial signals shaping the infrastructure connection & investment outlook.
Infrastructure readiness is a direct timing constraint for small modular reactors proposed for powering data center facilities. The relevant adjacent interfaces include high-voltage interconnection studies, grid-balancing requirements, nuclear site selection, contingency power procurement and regulated utility tariffs. Equipment suppliers therefore track facility engineering readiness and completed utility or mechanical dependencies, not only headline announcements of new data-center capacity. Where a site is developed in phases, approval of the first installation may support follow-on orders, although subsequent phases can involve different technical specifications or operating conditions. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Large-load growth can be measured from the IEA data-center electricity outlook, but that figure is not equivalent to procurement revenue in this market. A facility can expand its computing load while altering architecture, procurement timing or equipment density. Design standards, commissioning acceptance and power or cooling availability determine when specific components become required. Buyers often prefer arrangements allowing equipment delivery shortly before installation to reduce storage risk and rework. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Capital allocation is sensitive to the consequences of delay. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, waiting for approved interconnection or a validated facility interface can preserve capital but lengthen the period before compute capacity becomes operational. Suppliers gain greater order visibility once related contracts, installation drawings and acceptance criteria are finalized. Effective planning links equipment lead times with the onsite sequence and identifies fallback designs where feasible without compromising safety. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Grid Integration
Market Value Chain & System Architecture
Investment, product architecture and commercial signals shaping the market value chain & system architecture.
The small modular reactors proposed for powering data center facilities value chain begins with detailed application requirements, followed by design approval, component manufacturing or systems assembly, delivery, onsite integration and operational support. The key architectural concern is providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts. Buyers must separate the functional interface of the in-scope product from the broader cooling or electrical infrastructure system, because different contractors may be responsible for each boundary. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
System integrators coordinate specifications among OEMs, facility contractors and owners. Relevant purchasing documents define test limits, termination points, measurement responsibilities, access for maintenance and commissioning evidence. For a mature deployment model, a consistent acceptance protocol creates repeatability across sites while allowing country-specific regulatory and environmental adaptations. That balance lowers requalification costs without masking engineering differences that affect reliability. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance. The commercial consequence is visible in the relationship between reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering and installation schedules; a component that can be purchased independently still needs to match the larger system configuration and its documented operating conditions.
Value capture extends beyond original equipment where owners purchase replacement parts, monitoring and services. Supplier differentiation depends on lifecycle support, as a component may remain in service for years after a server or power platform is upgraded. Warranty terms and responsibility boundaries should follow the actual installation arrangement. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, an integrated system is commercially valuable when operational performance and accountability are explicit. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Grid Integration
Reliability Economics & Technical Risk
Investment, product architecture and commercial signals shaping the reliability economics & technical risk.
Reliability risk in small modular reactors proposed for powering data center facilities centers on site-specific nuclear licensing, cost escalation, supply-chain qualification, fuel availability, cooling-water access, spent-fuel plans and construction lead times. These exposures can be difficult to reverse after commissioning because infrastructure connections are often inaccessible during normal operation. Product qualification should therefore address worst-case duty, materials compatibility, system interfaces and maintenance procedures rather than relying solely on one nominal specification. The commercial impact includes not just replacement hardware but technician access, planned shutdown windows and potential lost computing availability. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Lifecycle costs vary with how equipment is installed and monitored. Readily serviceable designs can reduce recovery time, while poor documentation may turn routine interventions into prolonged troubleshooting. Operators should distinguish faults that arise within the product from failures attributable to adjacent systems or installation conditions. That distinction shapes warranties, service agreements and supplier selection. In high-availability facilities, assurance often requires both factory validation and onsite functional testing. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Procurement teams use reliability evidence to rank products with similar initial prices. Important questions include expected inspection intervals, replacement logistics, repeatability across production lots and ability to isolate a failure safely. Suppliers that offer clear failure analysis and traceable testing can improve buyer confidence. Such diligence is especially relevant to facilities with phased expansions, where unanticipated incompatibility may require changes across an installed fleet. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
Market Activity
Recent Market Developments
Dated institutional and supplier disclosures relevant to operating standards and demand.
May 2025 — NRC issued a standard design approval for the NuScale US460 reactor. The disclosure is relevant to product qualification, supply capability or project status, but is not itself evidence of realized market revenue. Official publication
2025 — NRC documented its progress on licensing reviews for advanced reactor designs and site projects. The disclosure is relevant to product qualification, supply capability or project status, but is not itself evidence of realized market revenue. Official publication
November 2024 — NRC issued the Hermes 2 test-reactor construction permits; these are not commercial power plant operating licenses. The disclosure is relevant to product qualification, supply capability or project status, but is not itself evidence of realized market revenue. Official publication
Grid Integration
Small Nuclear Reactors (SMR) for Data Center Market Outlook, 2026–2034
Investment, product architecture and commercial signals shaping the small nuclear reactors (smr) for data center market outlook, 2026–2034.
The global Small Nuclear Reactors (SMR) for Data Center Market is projected to rise from USD 1.13 billion in 2026 to USD 3.99 billion by 2034 at a 17.0% CAGR. The forecast spans consistently defined in-scope products and services throughout the projection period. Growth depends on the conversion of approved data-center development into orders for advanced modular reactor technology, project engineering and integrated nuclear power development linked specifically to contracted or proposed critical-computing electricity demand. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
The near-term trajectory is sensitive to construction and qualification schedules. Data-center developers, utilities, nuclear project sponsors and long-term power offtakers may have budget approval for future computing capacity before component specifications are frozen. Vendors able to supply interoperable parts, reliable field engineering and controlled revisions are better positioned to win repeat business as initial installations are expanded. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance. The commercial consequence is visible in the relationship between reactor pressure vessels, nuclear-grade heat exchangers, fuel supply chains, modular construction systems, turbines, protective systems and licensing engineering and installation schedules; a component that can be purchased independently still needs to match the larger system configuration and its documented operating conditions.
Medium-term opportunity reflects both new installations and replacement needs. Selection will increasingly weigh providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts alongside service reach and supply continuity. Engineering changes can create a new procurement cycle, but they can also delay product acceptance until test data and maintenance instructions are agreed. The result is a market where technical readiness and project timing matter as much as broad computing investment. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
By 2034, regional differentiation is likely to remain substantial. North America offers a mature pipeline of large buyers, Europe contributes modernization and compliance-led investment, and Asia-Pacific connects electronics manufacturing with new computing infrastructure. Latin America and the Middle East contribute selected campus opportunities, contingent on actual project completion. The addressable market is ultimately defined by qualified equipment delivery, not by speculative rack or energy-demand projections. For data-center developers, utilities, nuclear project sponsors and long-term power offtakers, this is a procurement and operational decision rather than a stand-alone technology preference: equipment must pass interface qualification, integrate with established maintenance procedures and provide clear accountability for commissioning performance.
FAQ
Frequently Asked Questions
Direct answers to market size, technology, applications and geographic intent.
What is the Small Nuclear Reactors (SMR) for Data Center Market size?
The market was USD 0.97 billion in 2025, is estimated at USD 1.13 billion in 2026, and is forecast at USD 3.99 billion by 2034, with a 17.0% CAGR during 2026–2034. The distinction is important for comparisons because adjacent product and infrastructure categories use different revenue definitions.
What drives demand for small modular reactors proposed for powering data center facilities?
Demand is driven by providing dispatchable firm electricity to large computing loads through licensed nuclear generation, grid connections and long-duration energy contracts, alongside increased physical computing capacity and more stringent performance requirements. The distinction is important for comparisons because adjacent product and infrastructure categories use different revenue definitions.
Which region leads this market?
North America has the largest estimated base-year revenue share at 57%, with the United States forming the principal market. The distinction is important for comparisons because adjacent product and infrastructure categories use different revenue definitions.
What products are included?
The market encompasses equipment and services where advanced modular reactor technology, project engineering and integrated nuclear power development linked specifically to contracted or proposed critical-computing electricity demand. The distinction is important for comparisons because adjacent product and infrastructure categories use different revenue definitions.
Which customers buy these systems?
Principal procurement groups include data-center developers, utilities, nuclear project sponsors and long-term power offtakers, subject to onsite technical requirements. The distinction is important for comparisons because adjacent product and infrastructure categories use different revenue definitions.
How is the market segmented by type?
The defined types are Light-Water SMR Designs, High-Temperature Gas Reactors, Molten-Salt and Fluoride-Cooled Systems, Fast Reactor and Microreactor Designs. The distinction is important for comparisons because adjacent product and infrastructure categories use different revenue definitions.
Which applications matter most?
The main applications are Hyperscale AI Data Center Supply, Colocation Campus Power, Utility-Backed Data Center Power, Offsite Dedicated Nuclear PPAs. The distinction is important for comparisons because adjacent product and infrastructure categories use different revenue definitions.
Which companies participate?
The relevant supplier and integrator ecosystem includes NuScale Power, X-energy, Kairos Power, GE Hitachi Nuclear Energy, Rolls-Royce SMR, TerraPower, Holtec International, Westinghouse Electric Company; their product roles are not interchangeable. The distinction is important for comparisons because adjacent product and infrastructure categories use different revenue definitions.
What risks constrain adoption?
Important operating risks include site-specific nuclear licensing, cost escalation, supply-chain qualification, fuel availability, cooling-water access, spent-fuel plans and construction lead times; site-level qualification and maintenance planning are central. The distinction is important for comparisons because adjacent product and infrastructure categories use different revenue definitions.
What is the 2034 outlook?
Demand depends on engineering qualification, capital-project execution and repeat deployments, with the forecast reflecting the defined small modular reactors proposed for powering data center facilities revenue boundary. The distinction is important for comparisons because adjacent product and infrastructure categories use different revenue definitions.
Research Basis
Research Sources & Evidence Base
Primary institutional, standards and manufacturer publications.
View research sources
01
CHAPTER 01
Introduction to Research & Analysis Reports
12 sections
⌄
1.1
Small Nuclear Reactors (SMR) for Data Center Market Definition
1.2
Market Segments
1.2.1
Segment by Type
1.2.2
Segment by Using
1.2.3
Segment by Application
1.3
Global Small Nuclear Reactors (SMR) for Data Center Market Overview
1.4
Features & Benefits of This Report
1.5
Methodology & Sources of Information
1.5.1
Research Methodology
1.5.2
Research Process
1.5.3
Base Year
1.5.4
Report Assumptions & Caveats
02
CHAPTER 02
Global Small Nuclear Reactors (SMR) for Data Center Overall Market Size
3 sections
⌄
2.1
Global Small Nuclear Reactors (SMR) for Data Center Market Size: 2025 VS 2034
2.2
Global Small Nuclear Reactors (SMR) for Data Center Market Size, Prospects & Forecasts: 2021-2034
2.3
Global Small Nuclear Reactors (SMR) for Data Center Sales: 2021-2034
03
CHAPTER 03
Company Landscape
10 sections
⌄
3.1
Top Small Nuclear Reactors (SMR) for Data Center Players in Global Market
3.2
Top Global Small Nuclear Reactors (SMR) for Data Center Companies Ranked by Revenue
3.3
Global Small Nuclear Reactors (SMR) for Data Center Revenue by Companies
3.4
Global Small Nuclear Reactors (SMR) for Data Center Sales by Companies
3.5
Global Small Nuclear Reactors (SMR) for Data Center Price by Manufacturer (2021-2026)
3.6
Top 3 and Top 5 Small Nuclear Reactors (SMR) for Data Center Companies in Global Market, by Revenue in 2025
3.7
Global Manufacturers Small Nuclear Reactors (SMR) for Data Center Product Type
3.8
Tier 1, Tier 2, and Tier 3 Small Nuclear Reactors (SMR) for Data Center Players in Global Market
3.8.1
List of Global Tier 1 Small Nuclear Reactors (SMR) for Data Center Companies
3.8.2
List of Global Tier 2 and Tier 3 Small Nuclear Reactors (SMR) for Data Center Companies
04
CHAPTER 04
Sights by Type
15 sections
⌄
4.1
Overview
4.1.1
Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Market Size Markets, 2025 & 2034
4.1.2
Light Water SMRs
4.1.3
HTGR SMRs
4.1.4
Sodium-cooled SMRs
4.1.5
Molten Salt SMRs
4.2
Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Revenue & Forecasts
4.2.1
Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Revenue, 2021-2026
4.2.2
Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Revenue, 2027-2034
4.2.3
Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
4.3
Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Sales & Forecasts
4.3.1
Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Sales, 2021-2026
4.3.2
Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Sales, 2027-2034
4.3.3
Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
4.4
Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Price (Manufacturers Selling Prices), 2021-2034
05
CHAPTER 05
Sights by Using
14 sections
⌄
5.1
Overview
5.1.1
Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Market Size Markets, 2025 & 2034
5.1.2
AI Training SMRs
5.1.3
Cloud SMRs
5.1.4
HPC SMRs
5.2
Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Revenue & Forecasts
5.2.1
Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Revenue, 2021-2026
5.2.2
Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Revenue, 2027-2034
5.2.3
Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
5.3
Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Sales & Forecasts
5.3.1
Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Sales, 2021-2026
5.3.2
Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Sales, 2027-2034
5.3.3
Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
5.4
Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Price (Manufacturers Selling Prices), 2021-2034
06
CHAPTER 06
Sights by Application
15 sections
⌄
6.1
Overview
6.1.1
Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Market Size, 2025 & 2034
6.1.2
Cloud Data Centers
6.1.3
AI Data Centers / AI Servers
6.1.4
High-Performance Computing (HPC)
6.1.5
Others
6.2
Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Revenue & Forecasts
6.2.1
Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Revenue, 2021-2026
6.2.2
Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Revenue, 2027-2034
6.2.3
Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
6.3
Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Sales & Forecasts
6.3.1
Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Sales, 2021-2026
6.3.2
Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Sales, 2027-2034
6.3.3
Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
6.4
Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Price (Manufacturers Selling Prices), 2021-2034
07
CHAPTER 07
Sights Region
45 sections
⌄
7.1
By Region - Global Small Nuclear Reactors (SMR) for Data Center Market Size, 2025 & 2034
7.2
By Region - Global Small Nuclear Reactors (SMR) for Data Center Revenue & Forecasts
7.2.1
By Region - Global Small Nuclear Reactors (SMR) for Data Center Revenue, 2021-2026
7.2.2
By Region - Global Small Nuclear Reactors (SMR) for Data Center Revenue, 2027-2034
7.2.3
By Region - Global Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
7.3
By Region - Global Small Nuclear Reactors (SMR) for Data Center Sales & Forecasts
7.3.1
By Region - Global Small Nuclear Reactors (SMR) for Data Center Sales, 2021-2026
7.3.2
By Region - Global Small Nuclear Reactors (SMR) for Data Center Sales, 2027-2034
7.3.3
By Region - Global Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
7.4
North America
7.4.1
By Country - North America Small Nuclear Reactors (SMR) for Data Center Revenue, 2021-2034
7.4.2
By Country - North America Small Nuclear Reactors (SMR) for Data Center Sales, 2021-2034
7.4.3
United States Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.4.4
Canada Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.4.5
Mexico Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.5
Europe
7.5.1
By Country - Europe Small Nuclear Reactors (SMR) for Data Center Revenue, 2021-2034
7.5.2
By Country - Europe Small Nuclear Reactors (SMR) for Data Center Sales, 2021-2034
7.5.3
Germany Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.5.4
France Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.5.5
U.K. Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.5.6
Italy Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.5.7
Russia Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.5.8
Nordic Countries Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.5.9
Benelux Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.6
Asia
7.6.1
By Region - Asia Small Nuclear Reactors (SMR) for Data Center Revenue, 2021-2034
7.6.2
By Region - Asia Small Nuclear Reactors (SMR) for Data Center Sales, 2021-2034
7.6.3
China Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.6.4
Japan Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.6.5
South Korea Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.6.6
Southeast Asia Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.6.7
India Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.7
South America
7.7.1
By Country - South America Small Nuclear Reactors (SMR) for Data Center Revenue, 2021-2034
7.7.2
By Country - South America Small Nuclear Reactors (SMR) for Data Center Sales, 2021-2034
7.7.3
Brazil Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.7.4
Argentina Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.8
Middle East & Africa
7.8.1
By Country - Middle East & Africa Small Nuclear Reactors (SMR) for Data Center Revenue, 2021-2034
7.8.2
By Country - Middle East & Africa Small Nuclear Reactors (SMR) for Data Center Sales, 2021-2034
7.8.3
Turkey Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.8.4
Israel Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.8.5
Saudi Arabia Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
7.8.6
UAE Small Nuclear Reactors (SMR) for Data Center Market Size, 2021-2034
08
CHAPTER 08
Manufacturers & Brands Profiles
78 sections
⌄
8.1
GE Vernova
8.1.1
GE Vernova Company Summary
8.1.2
GE Vernova Business Overview
8.1.3
GE Vernova Small Nuclear Reactors (SMR) for Data Center Major Product Offerings
8.1.4
GE Vernova Small Nuclear Reactors (SMR) for Data Center Sales and Revenue in Global (2021-2026)
8.1.5
GE Vernova Key News & Latest Developments
8.2
NuScale Power
8.2.1
NuScale Power Company Summary
8.2.2
NuScale Power Business Overview
8.2.3
NuScale Power Small Nuclear Reactors (SMR) for Data Center Major Product Offerings
8.2.4
NuScale Power Small Nuclear Reactors (SMR) for Data Center Sales and Revenue in Global (2021-2026)
8.2.5
NuScale Power Key News & Latest Developments
8.3
Holtec International
8.3.1
Holtec International Company Summary
8.3.2
Holtec International Business Overview
8.3.3
Holtec International Small Nuclear Reactors (SMR) for Data Center Major Product Offerings
8.3.4
Holtec International Small Nuclear Reactors (SMR) for Data Center Sales and Revenue in Global (2021-2026)
8.3.5
Holtec International Key News & Latest Developments
8.4
Kairos Power
8.4.1
Kairos Power Company Summary
8.4.2
Kairos Power Business Overview
8.4.3
Kairos Power Small Nuclear Reactors (SMR) for Data Center Major Product Offerings
8.4.4
Kairos Power Small Nuclear Reactors (SMR) for Data Center Sales and Revenue in Global (2021-2026)
8.4.5
Kairos Power Key News & Latest Developments
8.5
Rosatom
8.5.1
Rosatom Company Summary
8.5.2
Rosatom Business Overview
8.5.3
Rosatom Small Nuclear Reactors (SMR) for Data Center Major Product Offerings
8.5.4
Rosatom Small Nuclear Reactors (SMR) for Data Center Sales and Revenue in Global (2021-2026)
8.5.5
Rosatom Key News & Latest Developments
8.6
Westinghouse Nuclear
8.6.1
Westinghouse Nuclear Company Summary
8.6.2
Westinghouse Nuclear Business Overview
8.6.3
Westinghouse Nuclear Small Nuclear Reactors (SMR) for Data Center Major Product Offerings
8.6.4
Westinghouse Nuclear Small Nuclear Reactors (SMR) for Data Center Sales and Revenue in Global (2021-2026)
8.6.5
Westinghouse Nuclear Key News & Latest Developments
8.7
General Atomics
8.7.1
General Atomics Company Summary
8.7.2
General Atomics Business Overview
8.7.3
General Atomics Small Nuclear Reactors (SMR) for Data Center Major Product Offerings
8.7.4
General Atomics Small Nuclear Reactors (SMR) for Data Center Sales and Revenue in Global (2021-2026)
8.7.5
General Atomics Key News & Latest Developments
8.8
X-Energy
8.8.1
X-Energy Company Summary
8.8.2
X-Energy Business Overview
8.8.3
X-Energy Small Nuclear Reactors (SMR) for Data Center Major Product Offerings
8.8.4
X-Energy Small Nuclear Reactors (SMR) for Data Center Sales and Revenue in Global (2021-2026)
8.8.5
X-Energy Key News & Latest Developments
8.9
Rolls-Royce
8.9.1
Rolls-Royce Company Summary
8.9.2
Rolls-Royce Business Overview
8.9.3
Rolls-Royce Small Nuclear Reactors (SMR) for Data Center Major Product Offerings
8.9.4
Rolls-Royce Small Nuclear Reactors (SMR) for Data Center Sales and Revenue in Global (2021-2026)
8.9.5
Rolls-Royce Key News & Latest Developments
8.10
Oklo
8.10.1
Oklo Company Summary
8.10.2
Oklo Business Overview
8.10.3
Oklo Small Nuclear Reactors (SMR) for Data Center Major Product Offerings
8.10.4
Oklo Small Nuclear Reactors (SMR) for Data Center Sales and Revenue in Global (2021-2026)
8.10.5
Oklo Key News & Latest Developments
8.11
Seaborg Technologies
8.11.1
Seaborg Technologies Company Summary
8.11.2
Seaborg Technologies Business Overview
8.11.3
Seaborg Technologies Small Nuclear Reactors (SMR) for Data Center Major Product Offerings
8.11.4
Seaborg Technologies Small Nuclear Reactors (SMR) for Data Center Sales and Revenue in Global (2021-2026)
8.11.5
Seaborg Technologies Key News & Latest Developments
8.12
TerraPower
8.12.1
TerraPower Company Summary
8.12.2
TerraPower Business Overview
8.12.3
TerraPower Small Nuclear Reactors (SMR) for Data Center Major Product Offerings
8.12.4
TerraPower Small Nuclear Reactors (SMR) for Data Center Sales and Revenue in Global (2021-2026)
8.12.5
TerraPower Key News & Latest Developments
8.13
Deep Atomic
8.13.1
Deep Atomic Company Summary
8.13.2
Deep Atomic Business Overview
8.13.3
Deep Atomic Small Nuclear Reactors (SMR) for Data Center Major Product Offerings
8.13.4
Deep Atomic Small Nuclear Reactors (SMR) for Data Center Sales and Revenue in Global (2021-2026)
8.13.5
Deep Atomic Key News & Latest Developments
09
CHAPTER 09
Global Small Nuclear Reactors (SMR) for Data Center Production Capacity, Analysis
3 sections
⌄
9.1
Global Small Nuclear Reactors (SMR) for Data Center Production Capacity, 2021-2034
9.2
Small Nuclear Reactors (SMR) for Data Center Production Capacity of Key Manufacturers in Global Market
9.3
Global Small Nuclear Reactors (SMR) for Data Center Production by Region
10
CHAPTER 10
Key Market Trends, Opportunity, Drivers and Restraints
3 sections
⌄
10.1
Market Opportunities & Trends
10.2
Market Drivers
10.3
Market Restraints
11
CHAPTER 11
Small Nuclear Reactors (SMR) for Data Center Supply Chain Analysis
6 sections
⌄
11.1
Small Nuclear Reactors (SMR) for Data Center Industry Value Chain
11.2
Small Nuclear Reactors (SMR) for Data Center Upstream Market
11.3
Small Nuclear Reactors (SMR) for Data Center Downstream and Clients
11.4
Marketing Channels Analysis
11.4.1
Marketing Channels
11.4.2
Small Nuclear Reactors (SMR) for Data Center Distributors and Sales Agents in Global
12
CHAPTER 12
Conclusion
0 sections
⌄
13
CHAPTER 13
Appendix
3 sections
⌄
13.1
Note
13.2
Examples of Clients
13.3
Disclaimer
List of Tables
Table 1. Key Players of Small Nuclear Reactors (SMR) for Data Center in Global Market
Table 2. Top Small Nuclear Reactors (SMR) for Data Center Players in Global Market, Ranking by Revenue (2025)
Table 3. Global Small Nuclear Reactors (SMR) for Data Center Revenue by Companies, (US$, Mn), 2021-2026
Table 4. Global Small Nuclear Reactors (SMR) for Data Center Revenue Share by Companies, 2021-2026
Table 5. Global Small Nuclear Reactors (SMR) for Data Center Sales by Companies, (MW), 2021-2026
Table 6. Global Small Nuclear Reactors (SMR) for Data Center Sales Share by Companies, 2021-2026
Table 7. Key Manufacturers Small Nuclear Reactors (SMR) for Data Center Price (2021-2026) & (US$/KW)
Table 8. Global Manufacturers Small Nuclear Reactors (SMR) for Data Center Product Type
Table 9. List of Global Tier 1 Small Nuclear Reactors (SMR) for Data Center Companies, Revenue (US$, Mn) in 2025 and Market Share
Table 10. List of Global Tier 2 and Tier 3 Small Nuclear Reactors (SMR) for Data Center Companies, Revenue (US$, Mn) in 2025 and Market Share
Table 11. Segment by Type – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Table 12. Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Revenue (US$, Mn), 2021-2026
Table 13. Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Revenue (US$, Mn), 2027-2034
Table 14. Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Sales (MW), 2021-2026
Table 15. Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Sales (MW), 2027-2034
Table 16. Segment by Using – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Table 17. Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Revenue (US$, Mn), 2021-2026
Table 18. Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Revenue (US$, Mn), 2027-2034
Table 19. Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Sales (MW), 2021-2026
Table 20. Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Sales (MW), 2027-2034
Table 21. Segment by Application – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Table 22. Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2026
Table 23. Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2027-2034
Table 24. Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2021-2026
Table 25. Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2027-2034
Table 26. By Region – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Table 27. By Region - Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2026
Table 28. By Region - Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2027-2034
Table 29. By Region - Global Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2021-2026
Table 30. By Region - Global Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2027-2034
Table 31. By Country - North America Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2026
Table 32. By Country - North America Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2027-2034
Table 33. By Country - North America Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2021-2026
Table 34. By Country - North America Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2027-2034
Table 35. By Country - Europe Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2026
Table 36. By Country - Europe Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2027-2034
Table 37. By Country - Europe Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2021-2026
Table 38. By Country - Europe Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2027-2034
Table 39. By Region - Asia Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2026
Table 40. By Region - Asia Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2027-2034
Table 41. By Region - Asia Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2021-2026
Table 42. By Region - Asia Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2027-2034
Table 43. By Country - South America Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2026
Table 44. By Country - South America Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2027-2034
Table 45. By Country - South America Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2021-2026
Table 46. By Country - South America Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2027-2034
Table 47. By Country - Middle East & Africa Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2026
Table 48. By Country - Middle East & Africa Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2027-2034
Table 49. By Country - Middle East & Africa Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2021-2026
Table 50. By Country - Middle East & Africa Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2027-2034
Table 51. GE Vernova Company Summary
Table 52. GE Vernova Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 53. GE Vernova Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 54. GE Vernova Key News & Latest Developments
Table 55. NuScale Power Company Summary
Table 56. NuScale Power Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 57. NuScale Power Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 58. NuScale Power Key News & Latest Developments
Table 59. Holtec International Company Summary
Table 60. Holtec International Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 61. Holtec International Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 62. Holtec International Key News & Latest Developments
Table 63. Kairos Power Company Summary
Table 64. Kairos Power Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 65. Kairos Power Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 66. Kairos Power Key News & Latest Developments
Table 67. Rosatom Company Summary
Table 68. Rosatom Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 69. Rosatom Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 70. Rosatom Key News & Latest Developments
Table 71. Westinghouse Nuclear Company Summary
Table 72. Westinghouse Nuclear Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 73. Westinghouse Nuclear Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 74. Westinghouse Nuclear Key News & Latest Developments
Table 75. General Atomics Company Summary
Table 76. General Atomics Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 77. General Atomics Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 78. General Atomics Key News & Latest Developments
Table 79. X-Energy Company Summary
Table 80. X-Energy Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 81. X-Energy Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 82. X-Energy Key News & Latest Developments
Table 83. Rolls-Royce Company Summary
Table 84. Rolls-Royce Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 85. Rolls-Royce Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 86. Rolls-Royce Key News & Latest Developments
Table 87. Oklo Company Summary
Table 88. Oklo Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 89. Oklo Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 90. Oklo Key News & Latest Developments
Table 91. Seaborg Technologies Company Summary
Table 92. Seaborg Technologies Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 93. Seaborg Technologies Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 94. Seaborg Technologies Key News & Latest Developments
Table 95. TerraPower Company Summary
Table 96. TerraPower Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 97. TerraPower Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 98. TerraPower Key News & Latest Developments
Table 99. Deep Atomic Company Summary
Table 100. Deep Atomic Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 101. Deep Atomic Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 102. Deep Atomic Key News & Latest Developments
Table 103. Small Nuclear Reactors (SMR) for Data Center Capacity of Key Manufacturers in Global Market, 2024-2026 (MW)
Table 104. Global Small Nuclear Reactors (SMR) for Data Center Capacity Market Share of Key Manufacturers, 2024-2026
Table 105. Global Small Nuclear Reactors (SMR) for Data Center Production by Region, 2021-2026 (MW)
Table 106. Global Small Nuclear Reactors (SMR) for Data Center Production by Region, 2027-2034 (MW)
Table 107. Small Nuclear Reactors (SMR) for Data Center Market Opportunities & Trends in Global Market
Table 108. Small Nuclear Reactors (SMR) for Data Center Market Drivers in Global Market
Table 109. Small Nuclear Reactors (SMR) for Data Center Market Restraints in Global Market
Table 110. Small Nuclear Reactors (SMR) for Data Center Raw Materials
Table 111. Small Nuclear Reactors (SMR) for Data Center Raw Materials Suppliers in Global Market
Table 112. Typical Small Nuclear Reactors (SMR) for Data Center Downstream
Table 113. Small Nuclear Reactors (SMR) for Data Center Downstream Clients in Global Market
Table 114. Small Nuclear Reactors (SMR) for Data Center Distributors and Sales Agents in Global Market
List of Figures
Figure 1. Small Nuclear Reactors (SMR) for Data Center Product Picture
Figure 2. Small Nuclear Reactors (SMR) for Data Center Segment by Type in 2025
Figure 3. Small Nuclear Reactors (SMR) for Data Center Segment by Using in 2025
Figure 4. Small Nuclear Reactors (SMR) for Data Center Segment by Application in 2025
Figure 5. Global Small Nuclear Reactors (SMR) for Data Center Market Overview: 2025
Figure 6. Key Caveats
Figure 7. Global Small Nuclear Reactors (SMR) for Data Center Market Size: 2025 VS 2034 (US$, Mn)
Figure 8. Global Small Nuclear Reactors (SMR) for Data Center Revenue: 2021-2034 (US$, Mn)
Figure 9. Small Nuclear Reactors (SMR) for Data Center Sales in Global Market: 2021-2034 (MW)
Figure 10. The Top 3 and 5 Players Market Share by Small Nuclear Reactors (SMR) for Data Center Revenue in 2025
Figure 11. Segment by Type – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Figure 12. Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 13. Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
Figure 14. Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Price (US$/KW), 2021-2034
Figure 15. Segment by Using – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Figure 16. Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 17. Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
Figure 18. Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Price (US$/KW), 2021-2034
Figure 19. Segment by Application – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Figure 20. Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 21. Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
Figure 22. Segment by Application -Global Small Nuclear Reactors (SMR) for Data Center Price (US$/KW), 2021-2034
Figure 23. By Region – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Figure 24. By Region - Global Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021 VS 2025 VS 2034
Figure 25. By Region - Global Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 26. By Region - Global Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
Figure 27. By Country - North America Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 28. By Country - North America Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
Figure 29. United States Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 30. Canada Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 31. Mexico Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 32. By Country - Europe Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 33. By Country - Europe Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
Figure 34. Germany Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 35. France Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 36. U.K. Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 37. Italy Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 38. Russia Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 39. Nordic Countries Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 40. Benelux Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 41. By Region - Asia Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 42. By Region - Asia Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
Figure 43. China Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 44. Japan Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 45. South Korea Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 46. Southeast Asia Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 47. India Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 48. By Country - South America Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 49. By Country - South America Small Nuclear Reactors (SMR) for Data Center Sales, Market Share, 2021-2034
Figure 50. Brazil Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 51. Argentina Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 52. By Country - Middle East & Africa Small Nuclear Reactors (SMR) for Data Center Revenue, Market Share, 2021-2034
Figure 53. By Country - Middle East & Africa Small Nuclear Reactors (SMR) for Data Center Sales, Market Share, 2021-2034
Figure 54. Turkey Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 55. Israel Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 56. Saudi Arabia Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 57. UAE Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 58. Global Small Nuclear Reactors (SMR) for Data Center Production Capacity (MW), 2021-2034
Figure 59. The Percentage of Production Small Nuclear Reactors (SMR) for Data Center by Region, 2025 VS 2034
Figure 60. Small Nuclear Reactors (SMR) for Data Center Industry Value Chain
Figure 61. Marketing Channels
List of Tables
Table 1. Key Players of Small Nuclear Reactors (SMR) for Data Center in Global Market
Table 2. Top Small Nuclear Reactors (SMR) for Data Center Players in Global Market, Ranking by Revenue (2025)
Table 3. Global Small Nuclear Reactors (SMR) for Data Center Revenue by Companies, (US$, Mn), 2021-2026
Table 4. Global Small Nuclear Reactors (SMR) for Data Center Revenue Share by Companies, 2021-2026
Table 5. Global Small Nuclear Reactors (SMR) for Data Center Sales by Companies, (MW), 2021-2026
Table 6. Global Small Nuclear Reactors (SMR) for Data Center Sales Share by Companies, 2021-2026
Table 7. Key Manufacturers Small Nuclear Reactors (SMR) for Data Center Price (2021-2026) & (US$/KW)
Table 8. Global Manufacturers Small Nuclear Reactors (SMR) for Data Center Product Type
Table 9. List of Global Tier 1 Small Nuclear Reactors (SMR) for Data Center Companies, Revenue (US$, Mn) in 2025 and Market Share
Table 10. List of Global Tier 2 and Tier 3 Small Nuclear Reactors (SMR) for Data Center Companies, Revenue (US$, Mn) in 2025 and Market Share
Table 11. Segment by Type – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Table 12. Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Revenue (US$, Mn), 2021-2026
Table 13. Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Revenue (US$, Mn), 2027-2034
Table 14. Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Sales (MW), 2021-2026
Table 15. Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Sales (MW), 2027-2034
Table 16. Segment by Using – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Table 17. Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Revenue (US$, Mn), 2021-2026
Table 18. Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Revenue (US$, Mn), 2027-2034
Table 19. Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Sales (MW), 2021-2026
Table 20. Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Sales (MW), 2027-2034
Table 21. Segment by Application – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Table 22. Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2026
Table 23. Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2027-2034
Table 24. Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2021-2026
Table 25. Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2027-2034
Table 26. By Region – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Table 27. By Region - Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2026
Table 28. By Region - Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2027-2034
Table 29. By Region - Global Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2021-2026
Table 30. By Region - Global Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2027-2034
Table 31. By Country - North America Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2026
Table 32. By Country - North America Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2027-2034
Table 33. By Country - North America Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2021-2026
Table 34. By Country - North America Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2027-2034
Table 35. By Country - Europe Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2026
Table 36. By Country - Europe Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2027-2034
Table 37. By Country - Europe Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2021-2026
Table 38. By Country - Europe Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2027-2034
Table 39. By Region - Asia Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2026
Table 40. By Region - Asia Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2027-2034
Table 41. By Region - Asia Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2021-2026
Table 42. By Region - Asia Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2027-2034
Table 43. By Country - South America Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2026
Table 44. By Country - South America Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2027-2034
Table 45. By Country - South America Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2021-2026
Table 46. By Country - South America Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2027-2034
Table 47. By Country - Middle East & Africa Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2026
Table 48. By Country - Middle East & Africa Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2027-2034
Table 49. By Country - Middle East & Africa Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2021-2026
Table 50. By Country - Middle East & Africa Small Nuclear Reactors (SMR) for Data Center Sales, (MW), 2027-2034
Table 51. GE Vernova Company Summary
Table 52. GE Vernova Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 53. GE Vernova Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 54. GE Vernova Key News & Latest Developments
Table 55. NuScale Power Company Summary
Table 56. NuScale Power Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 57. NuScale Power Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 58. NuScale Power Key News & Latest Developments
Table 59. Holtec International Company Summary
Table 60. Holtec International Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 61. Holtec International Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 62. Holtec International Key News & Latest Developments
Table 63. Kairos Power Company Summary
Table 64. Kairos Power Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 65. Kairos Power Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 66. Kairos Power Key News & Latest Developments
Table 67. Rosatom Company Summary
Table 68. Rosatom Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 69. Rosatom Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 70. Rosatom Key News & Latest Developments
Table 71. Westinghouse Nuclear Company Summary
Table 72. Westinghouse Nuclear Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 73. Westinghouse Nuclear Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 74. Westinghouse Nuclear Key News & Latest Developments
Table 75. General Atomics Company Summary
Table 76. General Atomics Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 77. General Atomics Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 78. General Atomics Key News & Latest Developments
Table 79. X-Energy Company Summary
Table 80. X-Energy Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 81. X-Energy Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 82. X-Energy Key News & Latest Developments
Table 83. Rolls-Royce Company Summary
Table 84. Rolls-Royce Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 85. Rolls-Royce Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 86. Rolls-Royce Key News & Latest Developments
Table 87. Oklo Company Summary
Table 88. Oklo Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 89. Oklo Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 90. Oklo Key News & Latest Developments
Table 91. Seaborg Technologies Company Summary
Table 92. Seaborg Technologies Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 93. Seaborg Technologies Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 94. Seaborg Technologies Key News & Latest Developments
Table 95. TerraPower Company Summary
Table 96. TerraPower Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 97. TerraPower Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 98. TerraPower Key News & Latest Developments
Table 99. Deep Atomic Company Summary
Table 100. Deep Atomic Small Nuclear Reactors (SMR) for Data Center Product Offerings
Table 101. Deep Atomic Small Nuclear Reactors (SMR) for Data Center Sales (MW), Revenue (US$, Mn) and Average Price (US$/KW) & (2021-2026)
Table 102. Deep Atomic Key News & Latest Developments
Table 103. Small Nuclear Reactors (SMR) for Data Center Capacity of Key Manufacturers in Global Market, 2024-2026 (MW)
Table 104. Global Small Nuclear Reactors (SMR) for Data Center Capacity Market Share of Key Manufacturers, 2024-2026
Table 105. Global Small Nuclear Reactors (SMR) for Data Center Production by Region, 2021-2026 (MW)
Table 106. Global Small Nuclear Reactors (SMR) for Data Center Production by Region, 2027-2034 (MW)
Table 107. Small Nuclear Reactors (SMR) for Data Center Market Opportunities & Trends in Global Market
Table 108. Small Nuclear Reactors (SMR) for Data Center Market Drivers in Global Market
Table 109. Small Nuclear Reactors (SMR) for Data Center Market Restraints in Global Market
Table 110. Small Nuclear Reactors (SMR) for Data Center Raw Materials
Table 111. Small Nuclear Reactors (SMR) for Data Center Raw Materials Suppliers in Global Market
Table 112. Typical Small Nuclear Reactors (SMR) for Data Center Downstream
Table 113. Small Nuclear Reactors (SMR) for Data Center Downstream Clients in Global Market
Table 114. Small Nuclear Reactors (SMR) for Data Center Distributors and Sales Agents in Global Market
List of Figures
Figure 1. Small Nuclear Reactors (SMR) for Data Center Product Picture
Figure 2. Small Nuclear Reactors (SMR) for Data Center Segment by Type in 2025
Figure 3. Small Nuclear Reactors (SMR) for Data Center Segment by Using in 2025
Figure 4. Small Nuclear Reactors (SMR) for Data Center Segment by Application in 2025
Figure 5. Global Small Nuclear Reactors (SMR) for Data Center Market Overview: 2025
Figure 6. Key Caveats
Figure 7. Global Small Nuclear Reactors (SMR) for Data Center Market Size: 2025 VS 2034 (US$, Mn)
Figure 8. Global Small Nuclear Reactors (SMR) for Data Center Revenue: 2021-2034 (US$, Mn)
Figure 9. Small Nuclear Reactors (SMR) for Data Center Sales in Global Market: 2021-2034 (MW)
Figure 10. The Top 3 and 5 Players Market Share by Small Nuclear Reactors (SMR) for Data Center Revenue in 2025
Figure 11. Segment by Type – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Figure 12. Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 13. Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
Figure 14. Segment by Type - Global Small Nuclear Reactors (SMR) for Data Center Price (US$/KW), 2021-2034
Figure 15. Segment by Using – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Figure 16. Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 17. Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
Figure 18. Segment by Using - Global Small Nuclear Reactors (SMR) for Data Center Price (US$/KW), 2021-2034
Figure 19. Segment by Application – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Figure 20. Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 21. Segment by Application - Global Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
Figure 22. Segment by Application -Global Small Nuclear Reactors (SMR) for Data Center Price (US$/KW), 2021-2034
Figure 23. By Region – Global Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2025 & 2034
Figure 24. By Region - Global Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021 VS 2025 VS 2034
Figure 25. By Region - Global Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 26. By Region - Global Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
Figure 27. By Country - North America Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 28. By Country - North America Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
Figure 29. United States Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 30. Canada Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 31. Mexico Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 32. By Country - Europe Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 33. By Country - Europe Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
Figure 34. Germany Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 35. France Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 36. U.K. Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 37. Italy Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 38. Russia Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 39. Nordic Countries Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 40. Benelux Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 41. By Region - Asia Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 42. By Region - Asia Small Nuclear Reactors (SMR) for Data Center Sales Market Share, 2021-2034
Figure 43. China Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 44. Japan Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 45. South Korea Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 46. Southeast Asia Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 47. India Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 48. By Country - South America Small Nuclear Reactors (SMR) for Data Center Revenue Market Share, 2021-2034
Figure 49. By Country - South America Small Nuclear Reactors (SMR) for Data Center Sales, Market Share, 2021-2034
Figure 50. Brazil Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 51. Argentina Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 52. By Country - Middle East & Africa Small Nuclear Reactors (SMR) for Data Center Revenue, Market Share, 2021-2034
Figure 53. By Country - Middle East & Africa Small Nuclear Reactors (SMR) for Data Center Sales, Market Share, 2021-2034
Figure 54. Turkey Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 55. Israel Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 56. Saudi Arabia Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 57. UAE Small Nuclear Reactors (SMR) for Data Center Revenue, (US$, Mn), 2021-2034
Figure 58. Global Small Nuclear Reactors (SMR) for Data Center Production Capacity (MW), 2021-2034
Figure 59. The Percentage of Production Small Nuclear Reactors (SMR) for Data Center by Region, 2025 VS 2034
Figure 60. Small Nuclear Reactors (SMR) for Data Center Industry Value Chain
Figure 61. Marketing Channels